Disruptors
carbon footprint
Who we are
Formed in 2020, The Revive Group supports our partners to achieve maximum environmental sustainability through the provision of best-in-class environmental service equipment for their underground infrastructure maintenance and servicing operations.
Uniquely, Revive does this through a whole-of-life approach that delivers a significantly lower lifetime carbon footprint for the asset; benefiting the operator at the bottom line and benefiting the environment where it counts, through lower carbon emissions.
Pushing the boundaries
This whole-of-life approach revolves around three core principles:
- Lower carbon emissions at the manufacturing level through Revive’s industry-leading off-grid manufacturing site.
- Lower carbon emissions at the operating level through reduced fuel and water usage that comes from a more efficiently designed operating platform in the Revive Warrior and Revived products.
- Lower carbon emissions at the asset level through the ability to recondition and reuse major elements of the product – leading to second, third, and even fourth operational life cycles for each unit.
At The Revive Group, we create Partners in Sustainability, not customers.
Revive Park
Revive will move into its new manufacturing facilities at Revive Park in 2024 – Located in the heart of the Mid-Tipperary Decarbonising Zone at the Lisheen Mine, this sustainable off-grid site is poised to create new job opportunities and contribute to the economy through global exports.
The Revive Warrior
The Revive Warrior is a brand-new sewer cleaning unit that blends time-honoured methods with the cutting-edge efficiency of modern technology. Creating a product that is engineered to last, providing unparalleled operational effectiveness and longevity for our partners.
The Revive Program
Revitalising end-of-life sewer cleaning trucks – The Revive Program provides both environmental and financial advantages to our partners. This is achieved by remounting used and reconditioned steel tanks as well as reconditioned vacuum and pressure pumps onto new more efficient chassis.

The commitment and attention to detail from Kevin, and all at Revive, was first class. We are very happy with the quality, performance and overall standard of the fit-out and equipment in our new mainline CCTV units.
Damian Tranter, Director, Arch Drainage Services Ltd
Our partners
Revive are pleased to have quickly formed strong and rewarding relationships with some of the industry's leading companies and people.